{"id":272,"date":"2021-07-28T07:22:15","date_gmt":"2021-07-28T07:22:15","guid":{"rendered":"http:\/\/american-petroleum.com\/?page_id=272"},"modified":"2021-08-05T10:13:46","modified_gmt":"2021-08-05T10:13:46","slug":"startup-services","status":"publish","type":"page","link":"http:\/\/american-petroleum.com\/?page_id=272","title":{"rendered":"Startup Services"},"content":{"rendered":"<p>[vc_row el_class=&#8221;american-content&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<\/p>\n<h2>Start up services<\/h2>\n<h3>Delays &amp; Conflicts<\/h3>\n<p>American Petroleum US and American Petroleum Pvt, Ltd \u2019s leadership role continues through the basic engineering design work with interfacing management.<\/p>\n<h3>Project Meetings<\/h3>\n<p>American Petroleum US and American Petroleum Pvt, Ltd will coordinate all the process unit engineering kick-off and design review meetings. This avoids delays and conflicts and minimizes the amount of time required by key refinery staff. This includes attending the meetings for the non-API design units including the CDU\/VDU, Delayed Coker, H2 Plant, Sulfur Plant, Amine and Sour Water Units, and Utility Systems to ensure the overall refinery is optimized and consistent.<\/p>\n<p>The interfacing management of all battery limit cross-ties between API and non-API units, including oversight of the alternate routing plan, and design basis on-going consistency and communication with the non-API licensed unit designers is part of the API Managing Licensor role.<\/p>\n<h3>Feed Contractor Interfacing<\/h3>\n<p>American Petroleum US and American Petroleum Pvt, Ltd will attend the kick-off meeting with the selected FEED contractor to clarify scope of work issues, deliverables and schedule to provide a smooth integration of the API managed work and the FEED contractor work. This includes coordinating with the FEED Contractor to procure long lead critical equipment.<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;636&#8243; img_size=&#8221;full&#8221; alignment=&#8221;center&#8221; css_animation=&#8221;fadeInRight&#8221;][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row el_class=&#8221;american-content&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_column_text] Start up services Delays &amp; Conflicts American Petroleum US and American Petroleum Pvt, Ltd \u2019s leadership role continues through the basic engineering design work with interfacing management. Project Meetings American Petroleum US and American Petroleum Pvt, Ltd will coordinate all the process unit engineering kick-off and design review meetings. This avoids delays and conflicts and minimizes the amount of time required by key refinery staff. This includes attending the meetings for the non-API design units including the CDU\/VDU, Delayed Coker, H2 Plant, Sulfur Plant, Amine and Sour Water Units, and Utility Systems to ensure the overall refinery is optimized and consistent. The interfacing management of all battery limit cross-ties between API and non-API units, including oversight of the alternate routing plan, and design basis on-going consistency and communication with the non-API licensed unit designers is part of the API Managing Licensor role. Feed Contractor Interfacing American Petroleum US and American Petroleum Pvt, Ltd will attend the kick-off meeting with the selected FEED contractor to clarify scope of work issues, deliverables and schedule to provide a smooth integration of the API managed work and the FEED contractor work. This includes coordinating with the FEED Contractor to procure long&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"http:\/\/american-petroleum.com\/index.php?rest_route=\/wp\/v2\/pages\/272"}],"collection":[{"href":"http:\/\/american-petroleum.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/american-petroleum.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/american-petroleum.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/american-petroleum.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=272"}],"version-history":[{"count":4,"href":"http:\/\/american-petroleum.com\/index.php?rest_route=\/wp\/v2\/pages\/272\/revisions"}],"predecessor-version":[{"id":637,"href":"http:\/\/american-petroleum.com\/index.php?rest_route=\/wp\/v2\/pages\/272\/revisions\/637"}],"wp:attachment":[{"href":"http:\/\/american-petroleum.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}